Pages

PROJECT MATERIALS BY DEPARTMENT

Friday, 10 November 2017

ANTILIPIDEMIC EFFECT OF WATER (H20) EXTRACT OF DESMODIUM VELUTINUM LEAVES ON ALBINO WISTAR RATS

ANTILIPIDEMIC EFFECT OF WATER (H20) EXTRACT OF DESMODIUM VELUTINUM LEAVES ON ALBINO WISTAR RATS

ABSTRACT

This study evaluated the antilipidemic activity of water extracts from leaves of Desmodium velutinum on albino wistar rats. The phytochemical analysis of the leaf extract showed the presence of tannins, saponins, alkaloids, soluble carbohydrates, flavonoids, reducing sugar, steroids, cyanide and terpenoids. The animals were treated with known drugs (atorvastatin 2ml). There were significantly reductions in HDL 13.00 ±1.41 mg/dl LDL 1.20,± 0.14 mg/dl and triglyceride 39.00, 0.14 mg/dl, compared with water extract of Desmodium velutinum (0.5ml). when administered was found to significantly reduce lipid plasma which was LDL 1.90,± 0.00mg/dl, triglyceride 50.00±0.00mg/dl and increase HDL 25.00, ±0.00 mg/dl which is the good cholesterol. The water extract of Desmodium velutinum leaf can possibly normalize the plasma lipid when compared with the group given atorvastatin. The phytochemicals analysis showed that the association between these complexes and compounds and other constituent play an important role in the biological activity of the leaf. This study suggested that the water extract of D.velutinum leaf posses hypolipidemic as well as antilipidemic effect.
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF STUDY
Lipid and lipoprotein abnormalities play a major role in the development and progression of coronary artery diseases. Low levels of high density lipoprotein cholesterols have been identified as independent coronary risk factors (Rodrigue et al., 2010). High level of blood cholesterol is responsible for circulatory system disorder. Increase level of low density lipoprotein (LDL) is alarming for cardiovascular diseases and their risk is increased many times (Harman et al., 2011).

In developing countries, the occurrence of heart diseases increases rapidly (Nordestgard et al., 2010). Medical studies show that about 70% of adults over 50 years old suffer atherosclerosis. (Sherien and Azza, 2009). A large number of synthetic hypolipidemic drugs are available in market. Long term use of these drugs cause serious side effects, and are costly.

A medicinal plant is any plant which in one or more of its organ, contains substance that can be used for therapeutic purpose or which is a precursor for synthesis of useful drugs (Sivakumar et al., 2007). Plant contains a large number of bioactive phytochemicals that are responsible for pharmacological action of plants and used for development of drugs. Many  medicinal plants have shown their antilipidemic effect and proved their efficacy in cardiovascular diseases (Nordestgard et al., 2010; Wang, 1999).

One of such plants used very often in the management of the disease by the traditional medicine practitioners of Eastern Nigeria is Desmodium velutium, a perennial plant erect or semi-erect shrub or sub-shrub up to 3m light. It is widely distributed in subtropical Asia and tropical Africa. (Amowi and Azode, 2012).

Extracts of Desmodium velutium are used traditionally in some disease conditions particularly aphrodisiac and headache. Hence, Desomdium velutium may be a source of a pharmacological active agent useful in the treatment of aches, pains and diarrhoea. In Ghana, native doctors mix the root of Desmodium lasincarpum with some hot peppers and use it as enema to cure blood in urine. In Eastern States of Nigeria, the plant locally known as “Ikeagwuani”. (Onyegbule et al., 2012). In these present studies, I investigated the antilipidemic activity of the water (H2O) extract of Desmodium velutinum Leaves on albino wistar rats.
CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 DESMODIUM VELUTIMUM
Desmodium velutinum is an upright woody perennial herb, sub-shrub or shrub, up to 3m tall (Onyegbule, et al., 2012).

Leaflets are light green to blue, green or darker above, paler beneath and with prominent pallid veins, roundish to elliptic to rhombic ovate, 3-9.4cm long , 2-7cm wide, entire or repaid (indented at the termination of the lateral veins) and ciliate, think, mostly soft velvety on both Surface with long stiff golden, reddish or white hairs. Inflorescence arises in left axis, and at the end of branches. They are densely flowered racemes up to 10cm or mere long; at least the terminal ones often paniculately branched. Flowers are white pink to blue, mauve or brilliant purple, usually appearing whitish or pale when dry.

No comments:

Post a Comment