ANALYSIS OF BUSH PEAR AND ITS OIL
ABSTRACT
The research project studies the analysis of pear and its
oil. The mesocarp from edible African pear “DacryodesEdulis” were evaluated for
their oil yield. The pulp from this pear were oven dried at 100oC-105oC to a
moisture content level of 29%.The mesocarp was subjected to proximate analysis
to determine the percentage of the moisture, ash, fat, crude fibre, crude
protein and carbohydrate content which resulted to the values of 29%, 2%,
19.6%, 25.5%, 11.9%, and 12% respectively. Then the dried sample was pulverized
by using hammer mill and the oil was extracted by solvent extraction using
n-hexane. The oil extracted were analyzed for the chemical properties i.e.
(Acid value, saponification value, peroxide value, iodine value) etc. the
values obtained are respectively 8.41gm/KOH/gm, 185.1gm/KOH/gm, 2.8gm/KOH/gm
3.96gm/iodine/gm and Physical properties i.e. (Refractive index, Ph value,
specific gravity) which the values obtained are 1.469brix, 5.7 and 0.92. and
the The percentage oil yield content is 51.57%. This physio-chemical characteristic
and fatty acid composition of this oil show that they have industrial
potentials.
CHAPTER ONE
1.0 INTRODUCTION
In the major world, one major source of protein and vegetable
oil is from oil seeds /fruits (Williams M. A. 1996). Oil constitutes a well
defined class of naturally occurring substance. It is greasy, being soluble in
organic solvents but insoluble in polar solvents such as water. Oil is a liquid
at room temperature. Commercially, oil as well as fats is sourced from certain
plant groups mostly seeds and nuts and some parts of animal within which they
occur in relatively large quantity in an easily available form (McGraw-Hill,
1997). The existence of oil in certain plants has been known for century of
years (Ogbu 2005).
Oil can be grouped into edible and non-edible oil depending
on the amount of unsaponified matters and impurities contained therein. Edible
oil extracted from African pear, bread fruits, cashew nut, peanut etc. are
examples of vegetable oil which are naturally occurring esters of higher fatty
acids and glycerol, and are predominantly triglycerides with traces of mono and
diglycerides, sterples, anti-oxidants, vitamins, saturated and unsaturated free
fatty acids and other minor constituents. They are widely distributed in nature
and were first consumed as food. Later, oils were discovered to be used as
renewable raw materials for variety of non-food production. For instance;
soaps, creams, disinfectants, paints, enamels, inks etc.
Due to the oil boom in the early 70‟s, agriculture was abandoned
for petroleum and its product, but recently, things are taking a new turn in
Nigeria over dependence on petroleum for virtually everything has not really
helped matters. The economic situation in the country is bad and the general
standard of living is getting poorer with each passing day, Hence, the need for
a restructure of the economic system with an agricultural bias.
Most agriculture products such as these oils extracted from local seeds and nut, if properly monitored and harvested can be very useful for us down here and even exported for foreign exchange, hence the need for this project which deals on the extraction and analysis of African pear oil.
Most agriculture products such as these oils extracted from local seeds and nut, if properly monitored and harvested can be very useful for us down here and even exported for foreign exchange, hence the need for this project which deals on the extraction and analysis of African pear oil.
Extraction of oil from various vegetable resources is of
ancient origin. In fact, the natives from different tropical regions of the
globe have long been extracting oil from numerous oil-bearing plants. Humans,
since the ancient times have known how to extract fats and oil from their
natural resources. Historically, oils had been extracted by wrapping nuts in
clothes and then using devices operated by stones and levers to exert pressure
on them. But now, an improved form of mechanical device, which allowed
considerably more pressure to be exerted, is now in use in form of hydraulic
operated ram. This type of press is developed into a motorized hydraulic pump
system that pressed the nut bag and then released a pressed cake. The next
improvement in extracting oil is the screw press or expeller which is been
driven by electric motor.Because most press or expeller processes leads to
over-heating of the meal and leave too- much of the high value oil in cakes,
better methods of extracting the oil with solvent was developed. Bush pear was
processed by solvent methods alone in this project. This process can be accomplished
by a variety of ways but as might be expected, its efficiency depends to a
great extent on attaining intimate contact between the liquid solvent and the
solid containing the solute. The type of solvent available for this process
include n-hexane, petroleum ether, benzene, n-heptanes, acetone etc.
1.1 HISTORICAL BACKGROUND OF THE STUDY
The generic name “Dacryodes” was derived from the Greek word
“Dakruon” meaning [tear] referring to resin droplets on the bank surface of its
member while “Edulis” means edible emphasizing the importance of nutrients
fruits in the plants cultivation .The plant belongs to the family Burseraceae
whose members are characterized by an ovary of 2to 5 cells, prominent as
inducts in the bark, wood, and intrasteminal disk (Chunduff, 1984). The genus
Dacryodes consist of about 10 species (Verheji, 2002). However (Rehn, 1984)
indicated 80 species to encompass sub species of varieties, form and cultivars.
Two varieties are recognized; Var-parvicarpa and Var-edulis whose conical fruit
is smaller with the pulp. Var-edulis exhibit verticulate or sub-verticulate
branching while the branching is slender and opposite or bifurcate in
var-parvicarpa (Okafor et.al 1983).
Dacryodesedulis is an indigenous fruit in the Gulf of Guinea
and central African countries(Troupin, 1950), but due to the popularity of the
nutritious fruit for consumption, the plant is widely cultivated, extend its
area of distribution to Sierra-Leone, Uganda, Angola, Zimbabwe and Nigeria. It
rarely grows wild, thus the natural area of distribution is obscure
(verheji,2002). Lam gave four synonyms viz to the Dacryodesedulis
:CarnaruimedulieHook.f, CarnaruimsaphuEngl, Pachylobusedulis (G.don) Hook. F.
and PachylobussaphuEngl (Burkill ,1985,National research council,1996).
However, these synonyms have long been considered as the most
unambiguous synonyms (Boutelje,1980).The common names are in English, African
pear, African pear tree, Bush butter, Bush butter tree, Bush fruit tree, Eben
tree, Native pear (Kapseu and Tchiegang, 1996) and in French, Safoutier
(Burkill, 1985). The oil of fruits of DacryodesEdulis is a rich source of amino
acids and triglycerides. The fatty acid composition of fruit pulp oil of two
cultivars of bush pear [cultivar1 and cultivar2] grown in Nigeria were
determined. The oil is found in the pulp which is made up of 48% of oil and a
plantation can produce 7.8 tons of oil per hectare. It is also rich in vitamins
and a rich source of amino acids triglycerides (Derbyshire.et al 1976).
Bush pear oil is one of the most important rated versatile
vegetable oil. This is due to its uses in various spheres of life, most
especially as a very healthy food ingredient.
1.2 AIMS AND OBJECTIVES
This project is aimed at the analysis of bush pear and its
oil.The main objective of this study is to carry out proximate analysis and
physio-chemical properties of African pear oil extracted by solvent methods.
This physio-chemical properties determined are specific gravity, refractive
index, ph value, boiling point, acid value, iodine value, peroxide value, and
saponification value. To achieve the objectives of this project, it is
important to:-
a) Select the best suited solvent for optimum yield.
b) Characterize the extracted oil for compositions and
properties.
c) Test the suitability of the oil.
1.3 STATEMENT OF THE PROBLEM
This research work involves the analysis of African pear and
its oil though the food crop African pear potential is rated one of the highest
oil producing fruit crop yet it begs the question of its potential.
Furthermore, this project will answer the following questions;
Furthermore, this project will answer the following questions;
i) Solvent extraction by solvent method
ii) What is the optimum yield of the particle size using n-
hexane?
iii) Is there significant difference in the characterization
of the extracted oil as compared to theoretical value in terms of;
1) Chemical properties (Acid value, iodine value,
saponification value and peroxide value).
2) Physical properties (specific gravity, density, viscosity,
refractive index).
3) Chemical composition (protein crude, fibre, carbohydrate
and moisture.
1.4 SIGNIFICANCE/ECONOMIC IMPORTANCE OF THE STUDY
Characterizing the potentials of African pear/African pear
oil for many purposes has several implications. Communities in the West African
countries are significantly dependent on financial gain from agrarian
enterprise.
It is hope that from the project, optimum extraction
parameters which are quality of the oil would be established, the result would
add to the data bank that could help potential industrialist who intends to go
into vegetable table oil production from African pear. A crop that experiences
a post harvest loss in excess of 40% in areas where malnutrition is prevalent
is a problem for potentials to reclaim the lost percentage of either food or
other purposes is advantageous for producers and consumers alike.
Furthermore, the development of crops with indigenous appeal
can strengthen the agricultural and energy sectors of struggling economics,
identifying the oils fuels quantities, whether favorable or not, will help to
inform future crop and industry development.
1.5 SCOPE AND LIMITATION OF THE STUDY
In this project work, we intend to analyze and extract
completely African pear and its oil. Many research work has been done in giving
a detailed composition found in African pear. But this research account on the
optimum route to:
i) Extraction of vegetable oil from bush pear.
ii) Separation of pure oil from the solvent.
iii) Characterization of the African pear.
iv) Characterization of the oil extracted.
Due to the low yield of the above method (mechanical method)
of extraction, soxhlet and cold method of extraction are used i.e. solvent
extraction.
SOLD BY:
No comments:
Post a Comment