AN ASSESSMENT OF PROBLEMS AND PROSPECTS OF COOPERATIVE SOCIETIES
“A CASE STUDY OF GWAGWALADA AREA COUNCIL ABUJA”
ABSTRACT
This research work was designed to
see “An assessment of problems and prospects of cooperative societies in
Nigeria” as a case study of some selected cooperative society in
Nigeria, oral interview were carried out, several book were consulted
and also, finding of registered cooperative societies and number of
their members were carried out from the findings, it revealed that those
areas with cooperative societies gain more government attention than
those without cooperative societies. The study reveals that for a
government to achieve all round development empowering cooperative
societies should be given utmost attention.
CHAPTER ONE: INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Cooperative society is as old as man. As
man and societies are not static but change with social, economic
cultured and political happenings. Cooperative society is also dynamic
both in practical and theory.
In the traditional societies,
cooperation is reduced to custom and enforced by the authority of the
elders. People join hands to do their domestic and community works.
People also contribute money at a given period given it to their members
in turn as a form of credit that is Isusu.
In the traditional societies,
cooperation is informal not permanent, not registered, no by-law etc. On
the other hand, modern cooperatives are formal organizations,
registered, based on sound principles and written records, etc. The
world’s first successful and authentic cooperative shop known as the
Rochdale Society of Equitable Pioneers which was established in Rochdale
in 18844 was registered under the friendly societies AC on 28th October, 1844 but the shop did not open for business until 21st December 1844.
The idea was introduced due to harsh
time and depressed economic condition for people to from themselves into
cooperative societies so as to work jointly to improve their standard
of living.
The genesis of cooperative societies
present day Nigeria can be traced to (19922) when the first producer of
cooperative society was formed to provide cocoa farmers are common in
Nigeria, the societies have not been successful due to some problems
peculiar to them.
This concern by the country as a whole,
it was resolved to conduct a research on problems and prospects of
cooperative societies in Nigeria.
1.2 STATEMENT OF THE PROBLEM
In considering the statement of the problem the following issue readily come to mind:
- Firstly, can any competent person become a member of a society at any time? is the viability of the members is unlimited
- Secondly, does the government encourages and supports the formation of cooperative society at any time? Is the liability of the members unlimited
- Thirdly, does the government encourages and supports the formation of cooperative societies by providing subsidies and exemptions?
- Fourthly, can it exist for long due to a legal entity separate from its members?
- Lastly, can it be managed by one person only?
1.3 OBJECTIVES OF THE STUDY
As earlier stated in the background of
the study that cooperative societies in Nigeria have not recorded
success due to problems peculiar to the societies, it is therefore the
main aim of this study to identify problems and prospects of cooperative
society in Nigeria.
- The study attempts to identify problems faced by cooperative societies in Abuja and possible ways of solving the problems or ameliorate them.
- The work also intend to find out ways cooperative societies can be managed in order to have positive effect on the economy.
- The work also find ways and manner members of cooperative movement can be properly educated about membership for onward development of the society.
- It is also helped to find ways of survival for the falling cooperative societies in Nigeria.
- It is hoped that the problems and prospects of cooperative societies in Nigeria will be highlighted as the study unfold.
1.4 SIGNIFICANCE OF THE STUDY
The finding will improve one’s’
understanding on an assessment of problems and prospects of cooperative
societies in Nigeria with a view of making recommendation to improve the
situation.
This study will also serve as reference point for managers and students in improving performance of their societies.
1.5 RESEARCH METHODOLOGY
These procedures for accomplishing the
research problem which was gotten from the theoretical and practical
prospective of cooperative society in Nigeria.
1.6 RESEARCH QUESTION
In order to provide solution to the problems under investigation the following questions are to be solved in the study.
- Would lack of capital prevent the growth and development of cooperative society?
- Is it difficult to recover loans granted to members of cooperative society?
- Doe government regulation affect the growth of cooperative movement?
- To what extent does adverse economic conditions in the country affect cooperative movement?
- To what extent members benefit from government financial assistance?
- Does cooperative movement boost production in the economy?
1.7 STATEMENT OF HYPOTHESIS
The statement of hypothesis is just the related problem in research. They a guess statement of relationship between variables.
Hi: Cooperative movement has significant effect on economic in Nigeria.
Ho: cooperative movement has no significant effect on economic in Nigeria.
1.8 SCOPE OF THE STUDY
The research study is to provide us with
the basic concept of problems and prospects of cooperative societies in
Nigerian and what is limited Gwagwalada area council Abuja.
1.9 LIMITATION OF THE STUDY
The constrain of this study can be seen below:
- Money: There is no adequate and sufficient fund as at when needed for the researcher to meet the set objectives.
- Time: Is another factors that is against earlier completion of this research work. The time set for the research work compiled with other assignment to be executed simultaneously was adequate.
- Insufficient library and book facilities in the school
- Some people are not ready to give useful information and assistance for the accomplishment of the study.
1.10 DEFINITION OF TERMS
The researcher used certain terms to carry out this research project, the terms are explained below:
- Society: An organization formed for a particular purpose or activity.
- Cooperative Society: Is another means for forming a legal entity to conduct business and also a voluntary self help.
- Cooperator: Mean a member of any type of cooperative society.
- Share: A unit of ownership that represents an equal proportion of an organization.
- Primary Society: These are individuals that voluntarily decided to become members.
- Secondary Society: They are made up of various primary societies, the finance comes from the primary society.
- Meeting: Mean two or more people come together to discuss one or more topics, often in a formal setting.
- Finance: Payment of dues, consideration of loans, refund to old loans etc.
- Consumer Cooperative Society: Mean any cooperative society which owns shops where goods are retailed to its members and others.
- Liquidation: Is the process by which a company is brought to an end.
- Dissolution: The action for formally ending or dismissing an assembly, partnership or official body.
- Seal: A device or substance that is used to join two things together so as to prevent them coming apart or to prevent anything passing between them.
- Thrift: A business like a bank that is used for saving money.
- Prospects: The possibility or likelihood of some future event occurring.
- Re-engineering: Is a business management strategy originally pioneered in the early 1990s.
- Assessment: It refers to wide variety of methods or tools that educators used.
- Problems: A matter or situation regarded as unwelcome or harmful and needing to be dealt with.
No comments:
Post a Comment