A COMPARATIVE ENTHALPY (HEAT TRANSFER) APPROACH FOR CO- AND COUNTER CURRENT
CHAPTER ONE
1.O INTRODUCTION
1.1 BACKGROUND OF THE STUDY
According to the modern or dynamical Theory of heat: Heat a
form of energy. The molecules of a substance are in parallel motion. The mean
Kinetic energy per molecules of the substance is proportional to its absolute
temperature. In description of heat, a molecule may consist of one or two or
many atom depending upon the nature of the gas. The force of attraction between
the molecules of a perfect gas is negligible.
The atom in a molecules vibrate with respect to one another,
consequently a molecules has vibration energy. The whole molecules may rotate
about one or more axes, so it can have “notational energy”.
A molecule has “translational energy” due to its motion, thus
kinetic energy of a molecule is “the sum of its translational, rotational and
vibrational energies. Summarily heat energy given to a substance e is used in
increasing its internal energy. Increase in internal energy cause increase in
Kinetic energy or potential energy or increase in both the energies. Due to
increase in Kinetic energy of a molecules, its translational, vibrational or
rotational energy may increase.
In a nut shell “heat transfer is the science which deal with
the rate of bodies called the Source aims receiver KERN, [2006:1]
1.2 MECHANISM OF HEAT
Heat transfer is of three distinct way in which heat may pass
from a source to a receiver, although most engineering application are
combination of two or three method, which are conduction convection and
radiation Conduction: Conduction heat Transfer is energy transport due to
molecular motion and interaction. Conduction heat transfer through solids is
due to molecular vibration. Fourier determined that Q/A, the heat transfer per
unit area (W/m2) is proportional to the temperature gradient ∂t/∂x. The
constant of proportionality is called the material thermal conductivity K.
Fourier equation according to Colostate [2014:4] Q/A = -K ∂t/∂x …(1-1) The thermal
conductivity K depends on the material and also some what on the temperature of
the materials. Convection: Convection heat transform is energy transfer due to
bulk fluid motion. Convection heart transfer through gases and liquids form a
solid boundary results from the fluid motion along the surface.
Newton determined that the heat transfer/area Q/A, is
proportional to the fluid sold temperature difference T2. if the temperature
difference normally occurs across a thin layer of fluid adjacent to the solid
surface. This thin fluid, layer is called a boundary layer. The constant of
proportion is called the heat “transfer coefficient, h. Newton‟s equation:
According to Colostate [2014:4] Q/A = h ( Ts – Tf) …(1-2)
The heat transfer coefficient depends on the type of fluid
and the fluid velocity. The heat flux) depending on the area of interest, is
the local or area averaged. The various types of convective heat transfer are
usually categorized into the following
Fluid motion induced by density difference Forced Convection
Fluid motion induced by pressure differences from a fan or pump Boiling Fluid
motion induced by a change of phase from liquid to vapour Condensation Fluid
motion induced by a change of phase from vapor to liquid Source: Colostate
[2014:4]
RADIATION Radiation heat transfer is energy transport due to
emission of electromagnetic wave or photons form a surface or volume. The
radiation does not require a heat transfer medium, an can occur in a vacuum.
The heat transfer by radiation is proportional to the fourth power of the
absolute material temperature. The proportionality constant S or the stefom –
Boltzman constant equal to 5.67 x 158 ml/m2k4. The radiation heat transfer also
depends on the material properties represented by ℮, the emissivity of the
material. Q/A = бT4 …(1-3) Source: Colostate [2014:4]
1.3 PROCESS HEAT TRANSFER.
Heat transfer been described as the study of the rate at
which heat is exchanged between heat source and receiver usually treated
independently. Process heat transfer deals with the rate of heat exchanger as
the occur in the heat – transfer equipment of the engineering and chemical
processes. This approach brings to better focus the important of the temperature
difference between the source and receiver, which is after all, the driving
force whereby the transfer of heat is accomplished.
A typical problem of process heat transfer, is considered
with the quantities of heat to be transferred. The rate of which they may be
transferred be cause of the nature of the bodies, the driving potential the
extent and arrangement of the surface separating the source and receiver, and
the amount of mechanical energy which may be expanded to facilitate the
transfer, Since heat transfer involves can exchanger in a system, the loss of
heat by the one body will equal the heat absorbed by another within the confine
of the same system.
1.4 HEAT TRANSFER PROCESS EQUIPMENT
Heat exchanger been one of the commonly used equipment in
heat transfer a piece of equipment built for efficient heat transfer from one
medium to another. The media may be separated by a solid wall to prevent mixing
o they may be on direct conduct. They are widely used in space heating,
refrigeration, air conditioning, petro-chemical plant, petroleum engineers, and
natural gas processing and sewage treatment.
Heat exchange is device that exchanges the heat between
fluids of different temperatures that are separated by a solid wall. The
temperature gradient or he difference in temperature facilitate the transfer of
heat. Transfer of heat happens by three principle means: Convection,
conduction, radiation. Conduction occurs as the heat from the higher
temperature fluid passes through the solid wall.
The biggest contribution to heat transfer on a heat exchanger
is made through convection. To maximize the heat transfer, the walls should be
thin and made of a very conductive materials. In a heat exchanger forced
convection allows for the transfer of heat of one moving as heat is transferred
through the pipe wall it is mixed into the stream and the flow of the stream
removes the transferred heat. This maintain a temperature gradient between the
two fluids. The double-pipe heat exchanger because on fluid flows inside a pipe
and the other fluid flows between that people and another people.
That surrounds the first “this is a concentric tube
construction”. Flow in a double pipe heat exchanger can be co-current or
counter current. There are two flow configurations co-current is when the flow
of the two streams are in the same direction, counter current is when the flow
of the stream is in opposite direction.
1.4.1 TYPES OF HEAT EXCHANGER
In order to meet the widely varying applications, several
types of heat exchanger have developed which are classified on the basis of
nature of heat ex change process, relative direction of flow motion, design on
constructional features and physical state of fluids. Nature of heat exchange
process On the basis of nature of heat exchange process, heat exchanger are
classified as follows.
i. Director contact heat exchanger: These type of heat exchanger are
used predominantly in air conditioning condensing plants, water cooling,
industrial hot water heating etc and it involves heat transfer between hot cold
stream of two phases in the absence of a separating walls. Most direct contact
heat exchange fills under the gas-liquid category where heat is transfer
between a gas and begin in the form of drop, film, or spray.
ii. Direct Contact heat Exchanger: In this type of heat exchanger, the
heat transfer between two fluids could be carried out by transmission through
wall which separates the two fluids. On the other hand indirect – Contact heat
exchanger. “The fluid stream remain separate and the heat transfer continuously
through an impervious diving wall or into and out of a well in a transient,
thus c, ideally there is not direct contact between thermally interacting
fluids. This type of heat exchanger also referred to as a surpass heat,
exchanger, it can e further classified into direct –transfer type, storage type
and fluidized – bed exchanger.