undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

Monday, 30 October 2017

DESIGN AND INSTALLATION OF 200 WATT SOLAR POWER SYSTEM

DESIGN AND INSTALLATION OF 200 WATT SOLAR POWER SYSTEM

ABSTRACT

The 200W solar system was determined by load assessment, solar panel number determination, battery requirement and then inverter sizing. A complete solar panel rated at 200w was however purchased, together with 2 no. 150A solar battery, 1500W inverter and also 10A charge controller. These were assembled together with necessary protective gadgets like cut out switches; to give the 200W expected. The solar panel was mounted outside the building to allow for maximum collection of sun energy. It is expected that the system will help the department meet up with its office duties even when central power is not available.

CHAPTER ONE
INTRODUCTION

1.1 NEED FOR THE PROJECT
The general objective of the system is to provide efficiency, steadiness in the use of power appliances, by ensuring continuous availability of power supply even in the absence of mains. Uninterruptability of the system made it possible to eliminate all suspense from mains outage during the execution of an important and urgent assignment as may be required.
For better production of the system, the system was operated at a fully charged condition of the battery.

The project was rated 200W of 220V and 50Hz. It was expected that at this condition, it was favourable to carry load of the stipulated power. Loads of low power factors are not helpful since they produce spikes. Overloading is not potent to provide zero change over time and the inverter had LEDs which indicates mains failure and battery discharge and system fault.

1.2 SCOPE OF STUDY
This solar power source makes it possible to provide a clean reliable supply of alternative electricity free of sags or surges which could be found in the line voltage frequency.
The solar power system (SPS) system achieved this by direct current from solar panel and by rectifying the standard main supply, using the direct current to charge the batteries and to provide clean alternative power by passing the energy a filter system.
It has zero change over time and LEDs which indicates mains fail and battery discharge level and it provides 100% protection against line noise, spikes surges and audio frequency interference.

1.3 DEFINITION OF TERMS
1. Inverter unit: This unit converts a DC voltage into AC voltage with the help of the inverter unit.
2. Automatic Control Unit: This provides all the required control needed to meet up the objective of the whole system
3. Battery Unit: This is a secondary cell unit, capable of storing enough DC voltage from either sun or AC main, of which is later converted to AC voltage.

CHAPTER TWO
LITERATURE REVIEW
The use of the sun’s energy is nothing new and dates back to the beginning of time. In recent years however, the focus on energy consumption worldwide rapidly spurred growth in the research and development of ‟green” alternative fuel source including the sun, wind, hydro, wave, geothermal, hydrogen and other forms of energy. And today, because of that focus, the use of solar energy is expanding by leaps and bounds especially since sunlight is free, unlimited, readily available, clean and reliable.

No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed