Pages

PROJECT MATERIALS BY DEPARTMENT

Wednesday, 13 January 2016

HISTORY OF AGRICULTURAL DEVELOPMENT IN NIGERIA: A CASE STUDY OF ABOH-MBAISE WOMEN FROM 1960 – 2013

HISTORY OF AGRICULTURAL DEVELOPMENT IN NIGERIA: A CASE STUDY OF ABOH-MBAISE WOMEN FROM 1960 – 2013

ABSTRACT
This project entitled “The History of Agricultural Development in Nigeria” examines the role of women in agricultural development, using Aboh-Mbaise as a case study. Agriculture is an engine of growth and poverty reduction. But the sector is under performing in many states of Nigeria because women, who are often a crucial resource in agriculture and the rural economy, face constraints that reduce their productivity. Women constitute 60 to 80 percent of labour force in the agricultural activities of Nigeria. It is ironical that their contributions to agricultural and rural development are seldom noticed. This study considered Aboh Mbaise women in agriculture from 1960 to 2013 period. It also highlights the constraints women face in their participation in agriculture and the role of government policies and institution in eradicating the constraints. The research was carried out using the two major sources of research primary and secondary sources.
TABLE OF CONTENT
Title page    –        –        –        –        –              –        –        i
Certification         –        –        –        –        –        –        –     ii
Dedication            –        –        –        –        –        –               iii
Acknowledgement –       –        –        –        –        –        –     iv
Abstract      –        –        –        –        –        –        –        –    vi
Table of Content –        –        –        –        –        –        –     vii
          CHAPTER ONE: GENERAL INTRODUCTION
1.1     Background to the Study        –        –        –        –      1
1.2     Statement of Problem    –        –        –        –      –      4
1.3     Aims and Objectives      –        –        –        –        –     5
1.4     Scope / Delimitation      –        –        –        –        –      6
1.5     Significance of Study     –        –        –        –        –     6
1.6     Research Methodology –        –        –        –        –      7
1.7     Literature Review          –        –        –        –        –      7
          Endnotes
 
CHAPTER TWO: GEOGRAPHICAL, LOCATION AND THE SOCIO-ECONOMIC AND POLITICAL ACTIVITIES OF ABOH-MBAISE BEFORE 1900
2.1     Introduction                   –        –        –        –        –     18
2.2     Colonial Rule and Resistance In Aboh-Mbaise    –       20
2.3     Colonial Economy Policy of Aboh-Mbaise          –         22
2.4     Cotton Industry during the Colonial Era    –                25
2.5     Agriculture Under Colonial Rule      –        –                 30
          Endnotes
CHAPTER THREE:    WOMEN AND AGRICULTURE UNDER COLONIAL RULE 1900 TO 1960
3.1     Introduction         –        –        –        –        –            35
3.2     Status of Women during Colonial Rule      –              37
3.3     Women in Agriculture under Colonial Rule               38
3.4    Women in trade and Industry Under Colonial Rule                –        –        41
          Endnotes
CHAPTER FOUR: WOMEN AND AGRICULTURAL DEVELOPMENT 1960 – 2007
4.1     Introduction         –        –        –        –        –        –     48
4.2     The Role and Impacts of Aboh-Mbaise Women in Agriculture         49
4.3     Governmental Role to the Participation of Women in Agriculture     51
4.4     Women and the Acquisition of  Farmland  –          55
4.5     Constraints women face in Agriculture      –         59

Endnotes 

CHAPTER FIVE: SUMMARY AND CONCLUSION
5.1     Summary    –        –        –        –        –        –        –     69
5.2      Conclusion –        –        –        –        –        –        –      70

Bibliography –      –        –        –        –        –        –        –        –                 71


REQUEST FOR PROJECT MATERIAL

For the complete research material visit our CHECKOUT PAGE or fill the request form below:

[contact-form]

Thanks for your interest in the research topic we will reach out to you as soon as possible.


No comments:

Post a Comment