FARM POWER
INTRODUCTION
Power is needed on the farm for operating different tools, implements and during various farm operations. While mobile power is used for doing different field jobs, the stationary power is used for lifting water and operating irrigation equipment; operating threshers, shellers/decorticators, cleaners, graders and for other post harvest operations. The mobile farm power comes from human, draught animals, power tillers, tractors and self propelled machines, where as the stationary power is obtained from oil engines (diesel, petrol, kerosene) and electric motors.
Availability of adequate farm power is very crucial for timely farm operations for increasing production and productivity and handling the crop produce to reduce losses. With the increase in intensity of cropping the turn around time is drastically reduced and it is not possible to harvest and thresh the standing crop, on one hand, and prepare seed bed and do timely sowing operations of subsequent crop, on the other hand, in the limited time available, unless adequate farm power is available.
SOURCES OF FARM POWER
A farm power for various agricultural operations can be broadly classified as:
(1) Tractive work such as seed bed preparation, cultivation, harvesting and transportation, and
(2) Stationary work like silage cutting, feed grinding, threshing, winnowing and lifting of irrigation water.
These operations are done by different sources of power, namely human, animal, oil engine, tractor, power tiller, electricity and renewable energy (biogas, solar and wind).
HUMAN POWER
Human beings are the main source of power for operating small tools and implements.
They are also employed for doing stationary work like threshing, winnowing, chaff cutting and lifting irrigation Water. Human power is however the oldest source of power. It involves the utilization of human strength and ability and also introduction of man’s knowledge of manual labour. Aspects that need human effort include; handling of tools like hoe, cutlass, sickle rake e.t.c. also human power is needed in the operation of other machines. It is generally believed that there is surplus human power available for agricultural operations in India. According to 2001 census figures, the total Indian rural population is about 74 crores. Of the total rural population only 30 per cent is available for doing farm work. Hence the total number of persons available would be about 74 x 0.30 = 22.2 crores. This figure includes both the landless labourers as well as the owners of farms in the country. On the average a man develops nearly 0.I horsepower (hp.).
Therefore, the total power available through human source may be about 2.2 crore hp. But there is a steady decline in the number of landless labourers available for doing farm work in rural areas.
Managing Labour Peaks: In crop production system, labour peaks develop due to high labour demands in operations, which cannot be or have not been mechanized so far. For example, the operations like transplanting of paddy, weeding and inter-culture operations or harvesting of crops demand large number of human labour on each of the farms in the region. Such peaks have got to be managed if one desires to have high return from his enterprise. In general, the peaks are managed as follows:
i) Increasing the working hours.
ii) Extending the time period of operations.
iii) Adjusting the cropping pattern.
iv) Mechanizing the operations, wherever possible.
v) Decreasing the intensity of some operations.
Note: That India is used because India possess the best statistics for analyzing the topic
Advantages
1. Easily available and used for all types of work.
Disadvantages:
1. Costliest power compared to all other farms of power
2. Very low efficiency
3. Requires full maintenance when not in use and affected by weather condition and seasons
ANIMAL POWER
The most important source of power on the farm all over the world and particularly in India is animal. It is estimated that nearly 80 per cent of the total draft power used in agriculture throughout the world is still provided by animals, although the number of agricultural tractors has become double after every ten years since 1930. India with its 22.68 crore cattle possesses the largest number of cattle in the world. Among them the bullocks and buffaloes happen to he the principal sources of animal power on Indian farms. However, camels, horses, donkeys, mules and elephants are also used for the farm work. The average force a bullock can exert is nearly equal to one tenth of its body weight. But for a very short period, it can exert many more times the average force. Generally a medium size bullock can develop between 0.50 to 0.75 hp. Thus the variation in power developed by animals is considerable. Actually small size bullocks are not able to develop even 0.50 hp and most of them are not fit for heavy work. Animals Can he a very cheap source of farm power if raised by the farmer himself. It becomes the most costly source if the animal has to be bought from outside. Considering the overall situation of the draft animals available in the country, it is estimated that the total work animals may be about 7.56 crores in number, that is 33 per cent of the total horse power output from the animals would be about 7.56 x 0.50 = 3.78 crore hp.
Advantages
1. Easily available
2. Used for all types of work
3. Low initial investment
4. Supplies manure to the field and fuels to farmers and Live on farm produce.
Disadvantages:
1. Not very efficient
2. Seasons and weather affect the efficiency
3. Cannot work at a stretch
4. Require full maintenance when there is no farm work
5. Creates unhealthy and dirty atmosphere near the residence and Very slow in doing work.
MECHANICAL POWER
The third important source of farm power is mechanical power that is available through tractors and oil engines. The oil engine is a highly efficient device for converting fuel into useful work. The efficiency of diesel engine varies between 32 and 38 per cent, whereas that of the carburettor engine is in the range of 25 and 32 per cent. In recent years, diesel engines and tractors have gained considerable popularity in agricultural operations. Small pumping sets within 3 to 10 hp range are very much in demand. Likewise, oil engines of low to medium speed developing about 14 to 20 hp are successfully used for flourmills, oil ghanis, cotton gins, etc. Diesel engines of the larger size are used on tractors. It is estimated that about one million tractors of about 25 bhp range are in use for agricultural operations in India. Similarly, the total number of oil engines for stationary work may be taken as about 60 lakhs of 5 hp each. Thus the total power available from mechanical source would work out to be 55 million hp (Oil engines = 0.60 x 5 = 3.0 crore hp, tractors = 0.1 × 25 = 2.50 crore hp.
Advantages:
1. Efficiency is high
2. Not affected by weather
3. Can run at a stretch
4. Requires less space and cheaper form of power
Disadvantages:
1. Initial capital investment is high
2. Fuel is costly and
3. Repairs and maintenance needs technical knowledge.
ELECTRICAL POWER
Now-a-days electricity has become a very important source of power on farms in various states of the country. It is steadily becoming more and more available with the increase of various river valley projects and thermal stations. On an average about 1/10th of the total electrical power generated is consumed for the farm work. The largest use of electric power in the rural areas is for irrigation and domestic water supply. Besides this, the use of electric power in dairy industry, cold storage, fruit processing and cattle feed grinding has tremendously increased.
Electrical power is used in the powering of machines and engines like; shellers, dehaulers, decorticators, feed mixers e.t.c. it is also used in used In electrification operations which are used in farm steads and animal buildings. In addition, it is used for construction of electric fences in farms.
Advantages:
1. Very cheap form of power
2. High efficiency
3. Can work at a stretch
4. Maintenance and operating cost is very low and not affected by weather conditions.
Disadvantages:
1. Initial capital investment is high;
2. Require good amount of technical knowledge and
3. It causes great danger, if handled without care.
WIND POWER
The availability of wind power for farm work is quite limited. Where the wind velocity is more than 32 kmph, wind mills can be used for lifting water. Even today in India the wind power has not been fully harnessed. The most important reason is its uncertainty.
Experimental results show that a wind mill having 3.6 diameter wheel mounted on 12.0m tower is able to produce from 0.1 to 0.9 hp with the wind velocity varying from 6.4 to 37 km/h. Thus the average capacity of a wind mill would be about 0.50 hp. There are about 2540 mills installed in India. Hence the total output may be about 1250 hp only, but it is one of the cheapest sources of farm power available in the country.
Ministry of Non-Conventional Energy, Govt. of India have been making efforts to popularise the wind mill for power generation and water lifting in rural areas. But this source could not become attractive due to the following limitations of the system:
· Initial investment is high
· Repair facilities are not available in rural areas
· Even the matching pump sets and electric generators are not readily available in the country
· It not suitable for all situations in the country. For the present,
· the wind mills have limited scope of the use in the country.
Below are diagrams of wind mills for wind power generation;
Comparison Of Tractor And Animal Power
S/No. | Basis | Tractor / Power Tiller | Animal Power |
1. | Availability | Only large size tractors above 25hp size are available. Tillers up to 12hp size are available | They are available in plenty. |
2. | Overload capacity | Limited overload capacity | Very high overload capacity for short time. |
3. | Acceptability | Not very common because of high initial investment | The most important source of power at present. |
4. | Tractive work | This the best source of power for any traction job. With cage wheels it can be use for puddling also. | They are quite suitable for all kind of farm work. |
5. | Stationary work | All kinds of stationary works can be performed. | Bullocks have limited use for such works. |
6. | Transport Work | It is a quick means of medium distance transport. | Bullocks are also used for short and medium distance transport work. |
7. | Initial investment | Though cost per horsepower is low but overall investment per unit area is very high. | Cost per horsepower is high but overall investment is less. |
8. | Cost of Maintenance | Reasonable | Very high. |
9. | Rate of Depreciation | It is about I0 per cent year. | In fact the value increases in the beginning and then Decreases. |
10. | Cost of Operation | Cheaper per horsepower hour. | It is costlier than tractor. |
11. | Limitations | The technical know how of the people in general is low and as such farmers get discouraged to buy a tractor. This may no longer be valid in next 20 years. Tractor gives low field efficiency in small fields. | Constant care is required to keep the animal in good health. To some extent medical facilities are now available and as such it is not very difficult to cure a sick animal in rural areas. |
12. | Idleness | It does not consume any fuel or lubricant while not in use. | Even during Idle period, it needs care, feed and fodder. But, on the other hand, it provides manure for the crops. |
13 | Output | Very high and suitable for timely operations. | Low output. |
REFERENCES
De, Dipankar (1998). Research on Energy Requirement in Agricultural Sector under AICRP on ERAS. Agricultural Engineering Today Vol. 22(3-4): 60-85.
Singh, G and Singh, R.C. (2003) Harnessing Animal Power. Technical Bulletin, CIAE Bhopal.
Anonymous (2002). Production and sale of tractors. Agricultural Engineering Today Vol 26(1-2).
http//www.google.com
Esimi J. Sezuo Lecture Note On Farm Mechanization II


No comments:
Post a Comment